|
The MARSSIM continues to be implemented at an increasing number of D&D projects. Current implementation includes nuclear power plants (Trojan, Connecticut Yankee and Maine Yankee); DOE sites such as ANL, BNL, ETTP (Oak Ridge) and Rocky Flats; Army Corps FUSRAP sites; and at Air Force and Naval Base cleanup projects. The June 2003 issue of Operational Radiation Safety is dedicated to the applications of MARSSIM. Check out the 10 papers that discuss various aspects of MARSSIM implementation at D&D sites. Presentations and Reports
Surface Activity
Assessment Using the Sign Test
Comparison of Final
Status Survey Design Using MARSSIM Approach and the Former NUREG/CR-5849
Guidance at a Power Reactor Facility
MARSSIM Update:
Expanded Scope, Implementation Tools, and Examples MARSSIM
Implementation at University and Medical Research Facilities
Lessons Learned During Implementation of MARSSIM from an Independent
Verification Perspective Field
Instrumentation and Final Status Surveys Article from The IAEA Bulletin, Volume 45, Number 1 (2003) NRC Regulatory Issue Summary 2004-08 Results of the License Termination Rule Analysis (PDF) TLG Services - Bridgewater, Connecticut Three Mile Island Unit #2 RecoveryD&D Lessons Learned from the Mound Plant: Re-engineering the Facility Disposition (PDF)
Research Reactor Decommissioning Planning—It is Never Too Early to Start
(PDF) |
MARSSIM (Multi-Agency Radiation Survey and Site Investigation Manual ) Website © 2006 NukeWorker.com™
|